Sign In | Join Free | My portofva.com
China Jinzhou City Shitan Machinery Equipment CO. LTD. logo
Jinzhou City Shitan Machinery Equipment CO. LTD.
Jinzhou City Shitan Machinery Equipment CO. LTD Drilling Rig / Drill Rod / Drill Bit / Track Transporter / Drilling Mud Pump
Verified Supplier

7 Years

Home > Geological Drilling Rig Machine >

GK 200 Portable Investigation Geological Drilling Rig Machine for Sample Collecting

Jinzhou City Shitan Machinery Equipment CO. LTD.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

GK 200 Portable Investigation Geological Drilling Rig Machine for Sample Collecting

  • 1
  • 2

Brand Name : JINZHOU SHITAN

Model Number : ST-200

Certification : ISO

Place of Origin : China

MOQ : 1 set

Price : Negotiation

Payment Terms : T/T, Western Union

Supply Ability : 2000 sets per year

Delivery Time : 7-10 days

Packaging Details : Standard Export Package

Product Name : GK 200 Geological Drilling Rig Machine

Type : Geological Drilling Rig

Drilling Depth : 200 meters

Drilling Hole Diameter : 295mm

Voltage : 380V

Dimension(L*W*H) : 3850*1500*2250MM

Usage : Water Well

Application : Water Well Drilling / Core Drilling

Power Type : Diesel 58-65KW

Weight : 550KG

Warranty : 12 months

After sale service : Video Support

Contact Now

GK 200 Portable Investigation Geological Drilling Rig Machine for Sample Collecting

Product Introduction

It is a light weight, efficient,muti-function device of surface drill rig, which is mainly applied to drill water wells, agricultural irrigation wells, geothermal air conditioners hole and other uses of the well hole . This drilling rig can drill in the different stratum.This rig adopts the new type of hydraulic technology,matching a high torque hydraulic rotary motor and big diameter hydraulic cylinder propel

Product Parameters:

GK 200 Drilling depth

200m

Max open hole caliber

300mm

End hole caliber

75mm

Drilling Rod diameter

60mm

Drilling angle

90°~75°

Drill rig moving stroke

300mm

Power Engine

Diesel engine 22HP

Spindle speed

64 128 287 557 r/min

Spindle stroke

450mm

Max.Single line lifting capacity

2400kg

Max.Single line lifting speed

0.41 0.82 1.64m/s

Wirerope caliber

13mm

Mud pump detail

Diesel 170L/min

Work pressure

1.5Mpa

Water inlet pipe diameter

40mm

Water outlet pipe diameter

30mm

Product Advantages:

1. With oil pressure automatic feeding mechanism, high drilling efficiency.
2. Centralized handle, convenient operation, safe and reliable.
3. The drilling rig, shifting base and diesel engine (or motor) are all installed on the same underframe, occupying a small space.
4. Light weight, strong decomposition, easy to move, suitable for plain and mountain work.

Why is the water well drilling rig not suitable for use in rainy days?

After the well is completed, it is necessary to pump water to check the results. Under normal circumstances, a large draw down pumping can be done. The stable duration of the water level shall not be less than eight hours, and the water flow of the dynamic water level of the well shall be measured at the same time. The well drilling project shall ensure the smooth drainage of the construction site, so the rainy season shall be avoided. When working while excavating, the excavation slope shall be determined according to the physical and mechanical properties of the soil layer, generally 1:1.5, and there shall be a certain distance from the toe of the spoil slope to the upper opening of the excavation. For large wells with water inflow from the shaft wall, the water inlet hole and inverted filter layer of the shaft wall must be arranged according to the design requirements, and the water inlet hole shall be prevented from being blocked during construction. The filter material enclosure at the aquifer shall meet the requirements, the backfill shall have a certain super elevation, and the frozen soil in the backfill in winter shall not exceed 15%.

Matters needing attention during the drilling process of drilling and coring machine

What should we pay attention to when drilling?

1. When drilling at ordinary times, many people will not notice the water level difference and mud concentration, which can play a protective role;

2. It is better to operate the drilling while it is hot, and it is better not to stop for a while before continuing the operation;

3. During the drilling process, control the drilling speed and slow down the drilling according to the soil quality and other conditions;

4. Strengthen the inspection of pile position and hole formation during drilling. During the final hole formation, check the position, hole diameter, shape, depth, deflection and soil quality of the pile at the bottom of the hole. After passing the inspection, clear the hole immediately, hang the reinforcement cage and pour concrete.

GK 200 Portable Investigation Geological Drilling Rig Machine for Sample CollectingGK 200 Portable Investigation Geological Drilling Rig Machine for Sample Collecting

GK 200 Portable Investigation Geological Drilling Rig Machine for Sample Collecting

GK 200 Portable Investigation Geological Drilling Rig Machine for Sample Collecting

GK 200 Portable Investigation Geological Drilling Rig Machine for Sample Collecting

GK 200 Portable Investigation Geological Drilling Rig Machine for Sample Collecting


Product Tags:

dth drilling machine

      

water borehole drilling machine

      
China GK 200 Portable Investigation Geological Drilling Rig Machine for Sample Collecting wholesale

GK 200 Portable Investigation Geological Drilling Rig Machine for Sample Collecting Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Jinzhou City Shitan Machinery Equipment CO. LTD.
*Subject:
*Message:
Characters Remaining: (0/3000)